Our latest projects

Transocean Offshore International
Trinidad Cold Stack Nest
Project Date

July 2015 to July 2018

Brief Description

A total Ship Care Management System was designed and tailored to the unique requirements of TOI. This includes the living area installation and maintenance for the Shipboard Shipcare crew and all supporting auxiliary equipment.

Services Engaged

Project Management and Logistics Requirements provided:

  • Sewage system
  • Potable water maker
  • Ventilation system
  • Emergency fire system
  • Sanitation system

Transocean Offshore International
Trinidad Cold Stack Nest – Preservation
Project Date

July 2015 to Dec 2015

Brief Description

During preservation stage for nine ultra-deep drill ships, BTTL provided suitably qualified Offshore Labour to take the vessels from full operation through warn stack then to full Cold stack Status (laying up).

Services Engaged

Project Management and Logistics Requirements provided:

  • Qualified Manpower
  • Training for Personnel
  • Catering services
  • Technical services (electrical and Mechanical)
  • Fabrication and installation
  • Equipment Rentals
  • Offsite Fabrication

Repsol, Baker Hughes, Damus, Laing Sand Blasting, F.T. Farfan & Sons Ltd., Carl King and Tidewater Marine West Indies Ltd and BPTT
Snubbing Industrial Estate
Project Date

1995 to 2006

Brief Description

Buxo Trinidad and Tobago Limited (BTTL), managed owned and operated the Snubbing Industrial Estate, Galeota Road, Galeota Point, Guayaguayare for over 11 years. This estate was strategically located near to the heavy energy based operations along the southeastern tip of the island, in fact, within 1km from BPTT operations at the Point Galeota. It attracted a high level of rents obtained for both land sites and built accommodation.

Services Engaged

Constructed, operated, owned and Maintained over:

  • 34,000 sq. ft. of office buildings
  • 83,000 sq. ft. of warehouses
  • 177,000 sq. ft. of Pipe Yard

Harbert Int’l S.A. Finlandiaa N35-06 y Suecia Quito 0000 Ecuador Jeff Gormon
Angostura Pipeline Project Galeota Point
Project Date

Stopped April 2004

Brief Description

BTTL also managed and conducted all procurement activities including purchasing shipping and Supply Chain Management.

Services Engaged

BHP Onshore 18”& 30” Angostura Pipeline Project:

  • Galeota Point
  • BHP Shore
  • Approaches 18”&30”

Global Industries Offshore L.L.C.
BPTT Cannon Ball Project
Project Date

June 2005 to Jan 2006

Brief Description
Services Engaged

The provision of suitably qualified Offshore Labour in the areas of catering, maritime technical personnel and fabrication done through BTTL Project Management and Coordinating Services

Tog Mor
Subsea offshore installation work for NGC on the North- Eastern Offshore Pipeline
Project Date

Oct 2009 to Dec 2010

Brief Description
Services Engaged

The provision of suitably qualified Offshore Labour in the areas of catering, maritime technical personnel and fabrication done through BTTL Project Management and Coordinating Services.

LMR Drilling
BPTT Noel Project. drilling of 1,700 metre landfall at Galeota point.
Project Date

Stopped March 2006

Brief Description
Services Engaged
  • Supplied all plant, equipment, vehicles and accommodation
  • Provided all site staff and domestic staff to facilitate all operations
  • Provided Industrial real estate services which included warehouse storage
  • Provided services in Materials control
  • Sub-contractor management services
  • Managed and conducted all procurement activities including purchasing shipping
  • Supply Chain Management

Micheals Corporation
Subsea offshore installation work for NGC on the North- Eastern Offshore Pipeline.
Project Date

Stopped October 2007

Brief Description
Services Engaged
  • Provided Transportation logistics for the operation
  • Heavy Equipment Rental
  • Material Coordinating and Warehousing Services

Solitaire Marine Contractors
Sub sea offshore installation work for BPTT in the Mango and Cashima field.
Project Date

Stopped October 2007

Brief Description
Services Engaged
  • Provided suitably qualified local labour
  • Logistics and Management services

Allseas Lorelay Marine
Subsea offshore installation work for NGC on the North- Eastern Offshore Pipeline.
Project Date

Stopped October 2007

Brief Description
Services Engaged
  • The provision of suitably qualified
  • Offshore Labour in the areas of catering, maritime technical personnel and fabrication done through BTTL Project
  • Management and Coordinating Services

Superior Offshore
BPTT Mango, Cashima, Amherstia, Cannonball and Noel – NGC BUD Project, 5 offshore construction vessels.
Project Date

Stopped November 2007

Brief Description
Services Engaged
  • Buxo personnel recorded approximately 70,000 man- hours on Superior vessels to date without an accident or injury
  • Heavy Equipment Rentals
  • Materials Coordination and Warehousing Services
  • Fabrication and technical Services

Boskalis Westminster
NGC Beachfield Upstream Development (BUD) Pipeline Project Provision of Landfall Installation of a 36″ Gas Pipeline System
Project Date

Stopped April 2005

Brief Description
Services Engaged
  • Provided Logistic and Transport Services
  • Supplied industrial real estate both office and yard space
  • BTTL also managed and conducted all procurement activities including purchasing shipping and Supply Chain Management
  • Constructed the infrastructure to facilitate pulling in of the Bombax 54-inch Pipeline

Allseas Auducia
For the Subsea offshore installation work for NGC on the North-Eastern Offshore Pipeline
Project Date

Stopped April 2010

Brief Description
Services Engaged
  • The provision of suitably qualified Offshore Labour in the areas of catering, maritime technical personnel and fabrication done through BTTL Project Management and Coordinating Services
  • Industrial real estate, owned operated and maintained the site of the onshore support offices

Recommendations

“...the services delivered by Buxo were outstanding; the hired in personnel, both construction and marine crew, proved to be professional, well trained and very competent for the work on board our pipe lay vessel”

P.A.C. Van TielDirector

“...an exceptional customer service provider. The staff are most cooperative and helpful... ...no hesitation in recommending Buxo Trinidad and Tobago Limited for the provision logistics services.”

Chuck ParkerGeneral Manager

“...the work was completed and carried out safely and successfully with no lost time, accidents, or incidents”

Eric A. SeniorDirector of Projects, Marine Construction Services, GOM

“We found them professional and very competent and their assistance invaluable and we would have no hesitation providing a recommendation”

Barry GardnerManaging Director

“Their services have been executed safely and efficient. Therefore we have no hesitation in recommending this company for any future ventures, as they strive to maintain high quality”

Douwe LantingProject Manager

“...we have no hesitation in recommending Buxo Trinidad and Tobago Ltd for any future venture, as they strive to maintain high standards of quality in an ever changing environment.”

Stefan Van SnickVessel Superintendent

"For those companies (especially new to Trinidad) that require offshore or construction related labor, Superior highly recommends Buxo Trinidad and Tobago Limited as your labor supplier"

Ron WootenSenior Project Manager

“BIDCO Limited highly recommends Buxo Trinidad and Tobago Limited as an A-class service rpovider of certifed, experienced and skilled labour in an ever changing energy market...”

Jana herbert-FiuDirector

“...performed all these tasks and contracts in a safe and timely wanner while being cost effective and very responsible”

Jimmy Hofacre Project Manager